Difference between revisions of "TheConsole/Event Timeline"
From Game Detectives Wiki
[unchecked revision] | [unchecked revision] |
Hyzerblade (talk | contribs) (Timeline courtesy of Discord user Sky (#5528)) |
Hyzerblade (talk | contribs) |
||
Line 9: | Line 9: | ||
* Initial development starts on main labs --- January | * Initial development starts on main labs --- January | ||
* Development on main labs shut down for unknown reasons --- 13th February | * Development on main labs shut down for unknown reasons --- 13th February | ||
+ | * I. Wells disappears after an explosion during testing for Project Radiance. With no way to retrieve her after the co-ordinates were lost alongside Radiance-1 and numerous staff, she is presumed dead until otherwise found. --- 13th February | ||
* Visual feed 1 recorded --- 27th March | * Visual feed 1 recorded --- 27th March | ||
* Audio log recorded --- 23rd April | * Audio log recorded --- 23rd April |
Revision as of 01:46, 24 March 2017
Main Page > List of Investigations > TheConsole > Timeline
Contents
Pre-2015
- SV-1 was registered in 1984 after being secured by local authorities --- 1984
2015
- Initial development starts on main labs --- January
- Development on main labs shut down for unknown reasons --- 13th February
- I. Wells disappears after an explosion during testing for Project Radiance. With no way to retrieve her after the co-ordinates were lost alongside Radiance-1 and numerous staff, she is presumed dead until otherwise found. --- 13th February
- Visual feed 1 recorded --- 27th March
- Audio log recorded --- 23rd April
- 42-Iota-Convallaria site found --- 23rd July
- 20-Beta-Hyoscyamus site found --- 29th July
- 64-Pi-Rafflesia site found --- 12th August
- 99-Alpha-Orchidaceae site found --- 22nd August
- C-1 site found --- 19th September
- 13-Sigma-Asclepias site found --- 31st October
- 5-Kappa-Myosotis site found --- 16th November
2016
- Console is created at site C-1 by Dr H. Wells --- 6th May
- SB-D seen at site prior to origin of SB. - 15th July
- Tumblr blog started --- 16th July
- Figure of same description as SB-D seen spewing black substance confirmed to be composed of the same material as the SB. --- 25th July
- SB-3 found, figure allegedly seen sinking into shallow pool of substance. --- 9th August
- SB-1 quarantined --- 15th November
- SB-19 quarantined --- 25th November
- Youtube channel made --- 7th December
- SB-7 quarantined --- 12th December
- Figure is confirmed to be SB-D post-scan. Remains of missing persons found in substance nearby site. --- 30th December
2017
- Fort Rosner infested by specimen #15 --- 24th January
- Visual feed 1 uploaded --- 9th February
- SB-D sightings uploaded to blog --- 27th February
- File on Radiance-0 uploaded to blog --- 1st March
- Upon trying to test a dormant Radiance-1 to see if any parts could be salvaged or repurposed, a second explosion occured --- 9th March
- Unidentified entity with a high amount of Aether came close to site C-1 and damaged console's CPU --- 10th March
- Console's CPU fixed by Dr H. Wells --- 10th March
- Project Aether file uploaded to blog --- 15th March
- SV-1 Body delivered --- 20th March
- Project Starfish file uploaded to blog --- 22nd March
- Encrypted file containing login credentials and Project Radiance file --- 22nd March